Project comparisons

Change the option without losing the calculation you started from.

A version is a saved branch of the project. Keep the current result, create another version and change only the assumptions you want to test.

Project versionsComparison mode

Version 2

Existing proposal

Battery-only base case retained for review.

Version 3

Alternative proposal

Solar-assisted option with changed assumptions.

Calculate or create a version

Not every edit deserves a new branch.

Update the current version

Use this for corrections, missing inputs and ordinary refinement before the option is treated as a distinct proposal.

Create a new version

Use this for alternative designs, scenario changes and any branch you may need to show or revisit later.

Name the purpose

A comparison is easier to understand when each version name explains the decision it represents.

Useful comparison questions

Change one decision or change the whole direction.

A comparison is easier to understand when the purpose of each version is clear. Name the version after the decision it represents.

Battery chemistry

Compare lithium, lead-acid or another enabled chemistry while keeping the same load profile.

Battery-only or solar

Keep the backup requirement constant and test whether solar changes the installed storage or recharge plan.

Essential or full load

Create a reduced-load version rather than repeatedly removing and restoring appliances in one calculation.

Different operating hours

Compare normal use with a restricted outage schedule or a different day and night split.

System voltage

Test how a different battery or inverter voltage changes current, arrangement and installation-related outputs.

Panel choice

Compare panel wattage, count and string implications without changing the original solar proposal.

Conservative assumptions

Keep one version with cautious losses and sunshine inputs, then test a less conservative case separately.

AC or mixed AC/DC

Check whether moving suitable loads to DC changes inverter demand and distribution requirements.

A practical method

Keep a base case and branch from it.

1

Build the base case

Use realistic appliance data and operating hours. Calculate it, review the warnings and give the version a useful name.

2

Clone before changing direction

Create a new version from the working base when the next option shares most of the same appliance and scenario information.

3

Change the intended variable

Alter the battery, solar, runtime or scenario assumption you are trying to compare. Avoid changing five unrelated things unless that is the comparison.

4

Calculate both versions

A saved branch without results is only an input set. Calculate it before trying to compare the outputs.

5

Read the warnings again

A lower battery count is not automatically a better result. Check what changed elsewhere and whether new limits appeared.

6

Export the chosen version

Use the report from the version you intend to discuss or retain. The version name should make sense outside the editor.

A usable project history

Versions are not only for side-by-side shopping.

They also preserve the path of a project. That can matter when a client asks why one proposal changed, when a property owner wants to return to a simpler option, or when a team needs to review the assumptions behind a saved report.

Keep the version that answers the old question.

Create another one when the question changes. The project stays organised and the earlier calculation remains available.