Create An AC/DC Battery + Distribution Scenario
Use this path when the version contains both AC and DC loads, and solar is not part of the modelled period.
Check the loads first
This scenario is for a mixed appliance list. Use it when AC-only or DC-only paths would leave out part of the same option.
Create the scenario
On the Scenario editor, choose AC/DC - Battery + Distribution. The guided route creates the load groups, collects worst-case usage hours, and then uses Continue to Scenario Settings. GridGap will show that the scenario is ready before opening the starting settings.
Use the blank route if you want to choose the same scenario type in the blank scenario modal without guided starting defaults.
What to review
Review the battery, AC-side inverter, DC distribution, charging, and warnings sections after calculation. Mixed load paths need the whole result to be practical, not just one side of it.